MAINTENANCE SCHEDULE OPTIMIZATION METHOD FOR ELECTRIC POWER SYSTEM INCLUDING LARGE-SCALE WIND POWER

机译:大型风力发电系统的电力系统调度优化方法

摘要

The present invention discloses a maintenance schedule optimization method for an electric power system including large-scale wind power to build objective function to make it get optimal results, then constrain the objective function, constraint conditions include: constrain according to maintenance natural environment; constrain according to maintenance time of wind power plant; constrain according to maintenance site of wind power plant; constrain according to system reliability at wind power plant; constrain according to maintenance continuity of generator unit. Under the above constraint conditions, the electric power system is modeled with heuristic algorithm according to the above objective function. Through modeling the electric power system including large-scale wind power, optimize maintenance time of wind turbines in electric power system through modeling under a certain constraint conditions to maintain the wind power equipment properly while ensuring maximum efficiency of wind power generation at the same time.
机译:本发明公开了一种用于电力系统的维护计划优化方法,该方法包括:利用大型风力发电建立目标函数,使其获得最优结果,然后对该目标函数进行约束,约束条件包括:根据维护自然环境进行约束;根据风电厂的维护时间进行约束;根据风力发电厂的维护地点进行约束;根据风力发电厂的系统可靠性进行约束;根据发电机组的维护连续性进行约束。在上述约束条件下,根据上述目标函数,采用启发式算法对电力系统进行建模。通过对包括大规模风力发电在内的电力系统进行建模,通过在一定约束条件下进行建模,优化电力系统中风机的维护时间,以在保证最大风力发电效率的同时,适当维护风力发电设备。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号