首页> 外国专利> Advanced pass progression for build-up welding

Advanced pass progression for build-up welding

机译:用于堆焊的高级焊道进展

摘要

A method of build-up welding including depositing of a weld material on a substrate in a series of weld passes in side-by-side relation to form a first weld layer, wherein substantially all weld passes forming the first weld layer are deposited in a first pass direction. Subsequently, a series of weld passes are deposited in side-by-side relation on the first layer to form a second weld layer, wherein substantially all weld passes forming the second weld layer are deposited in a second pass direction opposite to the first pass direction. Each weld pass of each layer may be deposited at a location where it is restrained on no more than one lateral side extending parallel to the weld pass.
机译:一种堆焊的方法,包括以一系列并排的焊道并排关系在基板上沉积焊接材料以形成第一焊缝层,其中形成第一焊缝层的基本上所有焊缝都沉积在一个焊缝中。首过方向。随后,一系列焊道以并排关系沉积在第一层上以形成第二焊层,其中形成第二焊层的基本上所有焊道都在与第一道方向相反的第二道方向上沉积。 。每一层的每道焊道可沉积在限制在平行于焊道的一个侧面上的位置。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号