首页> 外国专利> Method for inducing fracture complexity in hydraulically fractured horizontal well completions

Method for inducing fracture complexity in hydraulically fractured horizontal well completions

机译:水力压裂水平井完井中引起裂缝复杂性的方法

摘要

A method of inducing fracture complexity within a fracturing interval of a subterranean formation (102) comprising characterizing the subterranean formation, defining a stress anisotropy- altering dimension, providing a wellbore servicing apparatus (106) configured to alter the stress anisotropy of the fracturing interval of the subterranean formation, altering the stress anisotropy within the fracturing interval, and introducing a fracture (150) in the fracturing interval in which the stress anisotropy has been altered. A method of servicing a subterranean formation comprising introducing a fracture into a first fracturing interval (2), and introducing a fracture into a third fracturing interval (6), wherein the first fracturing interval and the third fracturing interval are substantially adjacent to a second fracturing interval (4) in which the stress anisotropy is to be altered.
机译:一种在地下岩层(102)的压裂间隔内引起裂缝复杂性的方法,包括表征地下岩层,限定应力各向异性改变的尺寸,提供构造成改变岩层的压裂间隔的应力各向异性的井筒维修设备(106)。地下地层,在压裂间隔内改变应力各向异性,并在压裂间隔内引入裂缝(150),其中应力各向异性已经改变。一种维修地下地层的方法,包括将裂缝引入第一压裂层段(2),并将裂缝引入第三压裂层段(6),其中第一压裂层段和第三压裂层段基本上与第二压裂层相邻改变应力各向异性的时间间隔(4)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号