METHOD FOR MANAGING ACTIVE MULTI-DIMENSIONAL CONSTRUCTION PROCESS

机译:主动多维施工过程的管理方法

摘要

The present invention provides a method for managing an active multi-dimensional construction process, the method comprising the steps of: (A) storing, in a storage device, plan data including a planned construction period, a precedence relation, a planned start date and a planned end date for each of construction types required for performing a construction project; (B) storing, in the storage device, performance data including a progress management reference date, which serves as a reference for a progress management, a construction initiation date and a construction end date for each of the construction types, and an input rate indicating a percentage of the degree of construction progression; (C) calculating a residual construction period for each of the construction types using the planned construction period and the input rate and then storing the calculated residual period in the storage device, and calculating an actual start date and an actual end date for each of the construction types using the construction initiation date, the progress management reference date, the residual construction period, the construction end date, the precedence relation and the planned construction period and then storing the actual start date and the actual end date in the storage device; and (D) when the number of days by which a construction period is shortened is input for at least one of the construction types, calculating a changed residual construction period by subtracting the number of days by which the construction period is shortened from the residual construction period, and recalculating an actual start date and an actual end date for each of the construction types, using the changed residual construction period as the residual period of step (C).
机译:本发明提供了一种用于管理活动多维构建过程的方法,该方法包括以下步骤:(A)在存储设备中存储包括计划的建设周期,优先级关系,计划的开始日期的计划数据以及进行建筑项目所需的每种建筑类型的计划结束日期; (B)在存储装置中存储性能数据,该性能数据包括用作进度管理的参考的进度管理参考日期,每种建筑类型的施工开始日期和施工结束日期,以及指示输入速率施工进度的百分比; (C)使用计划的施工期和输入率来计算每种施工类型的剩余施工期,然后将计算出的剩余期存储在存储设备中,并为每种施工类型计算实际的开始日期和实际的结束日期。使用施工开始日期,进度管理参考日期,剩余施工期间,施工结束日期,优先级关系和计划施工期间的施工类型,然后将实际开始日期和实际结束日期存储在存储设备中; (D)在至少一种施工类型中输入了缩短工期的天数时,通过从剩余工期中减去缩短工期的天数来计算变更后的剩余工期。周期,并使用更改后的剩余施工周期作为步骤(C)的剩余周期,重新计算每种施工类型的实际开始日期和实际结束日期。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号