首页> 外国专利> COMPUTER ENABLED METHOD OF MANAGING APPOINTED DATE OF DELIVERY FOR SHIP MATERIALS ENABLED

COMPUTER ENABLED METHOD OF MANAGING APPOINTED DATE OF DELIVERY FOR SHIP MATERIALS ENABLED

机译:启用船舶材料的指定交货日期的计算机启用方法

摘要

The every ship type of material at the method delivery date of the executable management of computer is according to the present invention comprising steps of receiving mid-term plan timetable ship includes that mid-term arranges Start Date and a medium-term schedule deadline; Determine production implementation plan include produce Start Date and the output phase first day of the lunar year according to mid-term plan timetable; It includes required time table, each material that detailed information, which determines which node is based on production implementation plan,; The ship for corresponding to each material delivery schedule manufacturing schedule is determined, so that effectively the management each material of delivery schedule is according to each material of scheduling needed for changing. ;The 2015 of copyright KIPO submissions
机译:根据本发明,在计算机的可执行管理的方法交付日期,每种船舶材料都包括以下步骤:接收中期计划时间表;船舶包括中期安排开始日期和中期计划截止日期;以及根据中期计划时间表确定生产实施计划,包括生产开始日期和农历年初一的输出阶段;它包括所需的时间表,每个物料的详细信息,它决定了哪个节点基于生产实施计划;确定与每个物料交货计划制造计划表相对应的船,以便有效地根据更改所需的每个计划物料管理交货计划的每个物料。 ; 2015年版权KIPO提交文件

著录项

  • 公开/公告号KR20140138443A

    专利类型

  • 公开/公告日2014-12-04

    原文格式PDF

  • 申请/专利权人 HYUNDAI HEAVY INDUSTRIES CO. LTD.;

    申请/专利号KR20130058654

  • 发明设计人 KIM EUN BAEK;

    申请日2013-05-23

  • 分类号G06Q10/06;

  • 国家 KR

  • 入库时间 2022-08-21 15:01:30