首页>
外国专利>
INSTALLATION FOR SIMULTANEOUS MINING AND MAINTENANCE MECHANICAL FORCING bending pipes for fluid recovery
INSTALLATION FOR SIMULTANEOUS MINING AND MAINTENANCE MECHANICAL FORCING bending pipes for fluid recovery
展开▼
机译:安装用于同时采掘和维护的机械力弯管,以进行流体回收
展开▼
页面导航
摘要
著录项
相似文献
摘要
1. Installation for the simultaneous production and maintenance of the implementation of the mechanical injection of coiled tubing recovery system fluids comprising: a) system (12) borehole casing; b) surface unit (30) carrying the weight of said pipe, providing fluid circulation environments inside and outside the well, and comprising an underground base (513), the head (50) to create a hydraulic head and connective coupling means (15); c) the system (14) of the flexible pipe; d) system (16) operating pipe and e) a pump assembly (19), soda rzhaschy valve (192) and a stationary pump (20); characterized in that: the head part (50) to create a hydraulic head is adapted to a hydraulic fluid admission via a hydraulic connecting device (501), which leads to longitudinal lengthening hydraulic pistons (502) , forcing steel connecting cables (514) to elongate and to pass through the group of pulleys (503) for lifting the carriage (505) which, in turn, raises the system (14) of the flexible tube to move up the coiled tubing system and vypus and the hydraulic fluid from the hydraulic pistons, resulting in the displacement of a system of flexible pipe down, and the head portion to create a hydraulic head comprises a pump connection unit (504), through which there is injection of fluids or reagents into the well through the system (14) of the flexible pipe; a pump connection unit (504) is connected to a fixed metal tube (518) attached to the metal structure (515) and connected to one end of the flexible conduit (509) by a pivotal
展开▼