METHOD OF TERMINATION OF PIPELINE INSTALLATION SHIP (Options) and a method of restarting Laying of pipelines from the vessel, set of elements for said process, ship and connector for the nominated vessel
METHOD OF TERMINATION OF PIPELINE INSTALLATION SHIP (Options) and a method of restarting Laying of pipelines from the vessel, set of elements for said process, ship and connector for the nominated vessel
1. A method of laying pipeline termination from the vessel, characterized by supply vessel winch device, tensioning device and the tubular member and comprising setting the tubular member between the winch device and the end of the pipeline with the receiving tubular member and the tensioner pipe descent through winch apparatus and tensioner load allocation from tensioning the pipeline between the tensioner and winch apparatom.2. A method according to claim 1, wherein the load of the pipeline tension take more than apparata.3 load winch. A method according to claim 1, wherein the load is distributed from conduit tension between the winch device and the tensioning device substantially ravnomerno.4. A method according to claim 1, wherein the stacking duct is S-shaped circuit ukladki.5. A method according to claim 1 which comprises inserting the intermediate element above the end of the pipeline, the pipeline for the descent of the intermediate member and the length of the repetition of said insertion and lowering in relation to groups of intermediate elementov.6. A method according to claim 5, wherein when inserting the intermediate element releasably connect winch apparatus and the intermediate member by soedinitelya.7. A method according to claim 5, wherein when inserting the intermediate elements releasably connect the intermediate member with the adjacent intermediate elementom.8. A method according to claim 5, wherein the intermediate elements are inserted above the tensioning device, wherein the tubular member comprises at least one intermediate element.9. A method according to claim 5, wherein the intermediate elements are inserted below the tensioner ustroystva.10. The method of claim 5, VC
展开▼