首页> 外国专利> WAY ahead of STAGED lining of mine workings

WAY ahead of STAGED lining of mine workings

机译:在矿山开采的分段衬砌之前

摘要

The process of advancing the phase-lining of mine workings, including the construction of advanced lining, production under her generation and the subsequent installation of a permanent lining, characterized in that before the next cycle of production from the roof in the direction of its future at an angle of -15 ° to 60 ° to the plane of the roof produce drilling in an amount not less than one per meter of roof width generating install reinforcing elements in them, then drilled wells produce injection bonding composition after curing bonding compositions conducted generation protected advanced lining, erection permanent lining produced with a delay from the bottom .
机译:推进矿山开采阶段衬砌的过程,包括建造高级衬砌,在她的统治下进行生产以及随后安装永久衬砌,其特征在于,在下一个屋顶生产周期之前,朝着未来的方向发展在与屋顶平面成-15°至60°的角度下,每米屋顶宽度不少于一个钻孔,在其中产生安装增强元件,然后在固化的粘结组合物固化后,在钻井中产生注入粘结组合物受保护的高级衬里,从底部延迟安装的永久衬里。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号