首页> 外国专利> CONTROL METHOD OF FAILURE OF DEACTIVATION OF SECTIONALISING SWITCH OF BUSES OF TWO-TRANSFORMER SUBSTATION AT RECOVERY OF NORMAL CIRCUIT OF ELECTRIC POWER SUPPLY OF RING NETWORK

CONTROL METHOD OF FAILURE OF DEACTIVATION OF SECTIONALISING SWITCH OF BUSES OF TWO-TRANSFORMER SUBSTATION AT RECOVERY OF NORMAL CIRCUIT OF ELECTRIC POWER SUPPLY OF RING NETWORK

机译:环网电源正常电路恢复时两变电站母线分段开关失灵的控制方法

摘要

FIELD: electricity.;SUBSTANCE: invention relates to automation of electric networks and is intended to control failure of deactivation of a sectionalising switch of buses of a two-transformer substation at the recovery of a normal circuit of electric power supply of a ring network. Appearance of voltage on buses of the main power supply unit is controlled, and if it appears, counting of the delay time of deactivation of the sectionalising bus switch is started; with that, reduction of operating current consumed from a standby power supply unit by a value determined by the load of the reserved line is controlled; and if no reduction of operating current occurs by the end of the time counting, a conclusion is made on the failure of deactivation of the sectionalising bus switch of the two-transformer substation at the recovery of the normal circuit of electric power supply of the ring network.;EFFECT: enlarging functional capabilities by receiving the information on the failure of deactivation of the sectionalising bus switch of a two-transformer substation at the recovery of the normal circuit of electric power supply of the ring network.;2 dwg
机译:技术领域本发明涉及电网的自动化,并且旨在在环形网络的供电的正常电路恢复时控制两变压器变电站的总线的分段开关的停用失效。控制主电源单元的总线上的电压的出现,如果出现,则开始计数分段总线开关的停用延迟时间。由此,控制从备用电源单元消耗的工作电流减少由保留线的负载确定的值。并且如果在计时结束之前没有发生工作电流的减少,则得出结论,即在环网的正常电路恢复时,两台变电站的分段总线开关失效。效果:通过在环形网络供电正常电路恢复时接收有关两台变电站分段总线开关失效的信息,来增强功能能力; 2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号