METHOD FOR HORIZONTAL DRAINING OF WATERLOGGED STRUCTURES ON PILE FOUNDATIONS
METHOD FOR HORIZONTAL DRAINING OF WATERLOGGED STRUCTURES ON PILE FOUNDATIONS
展开▼
机译:桩基上沉水结构水平排水的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
FIELD: construction.;SUBSTANCE: method for horizontal draining of waterlogged structures on pile foundations relates to construction, namely to the construction of drainage systems for the protection of structures on pile foundations against ground water logging. As per the proposed method, dewatering of a waterlogged object is achieved due to the fact that from one radial drain well developed along the outer wall outside the structure normally to rows of the load-carrying piles and equipped with a filter there passed are additional side drain wells between the rows of piles. Drilling of additional shafts is performed by means of a downhole motor and diverting devices out of the above said radial well. The steadiness of walls of the additional wells at drilling is provided by the application of hydrolysed polyacrylonitrile or other self-decomposed drill fluids. After driving of the side additional shafts is completed, the drill tool is disconnected and used for the shutoff of the well bottom, and the motor together with drill pipes is removed through a filter pipe that was drawn by means of the downhole motor.;EFFECT: proposed drainage system allows solving a problem of protection against waterlogging of structures on pile foundations.;2 dwg
展开▼