首页> 外国专利> PROCEDURE FOR ELIMINATION OF BEHIND- CASING FLOWS

PROCEDURE FOR ELIMINATION OF BEHIND- CASING FLOWS

机译:消除套路流程

摘要

FIELD: oil and gas industry.;SUBSTANCE: method includes expansion of a casing string in each interval of behind-the-casing flows outside limits of elastic deformation until gaps between the string and the cement as well as between the cement and the rock are eliminated. Expansion is performed by a device equipped with rollers used as working members; the device is run in at the drill string to the upper mark of the interval of required expansion above the existing or preliminary made perforation interval, thereupon by rotation of the device with simultaneous downfeed and injection of fluid, under the action of the above fluid the rollers are set to the operating position; by an impact on the inner surface of the casing string it is expanded by rolling out within the whole interval of the behind-the-casing flow or at several individual areas. At rolling-out excessive stress is generated on the walls of the casing string in order to reinforce the behind-the-casing cement by its thickening, at that the diameter of the rolling out device in the operating position is selected by 4-8.5% more than the inner diameter of the casing string before expansion.;EFFECT: speeding-up of the repair process, reducing the number of operations.;3 dwg
机译:领域:方法:包括在弹性变形极限之外的套管后流动的每个间隔中膨胀套管柱,直到套管与水泥之间以及水泥与岩石之间的间隙达到被淘汰。扩张通过装备有用作工作构件的辊的装置来进行;在上述流体的作用下,通过旋转设备并同时向下进料和注入流体,使设备在钻柱中穿入所需膨胀的间隔的上限,超过现有或初步设定的射孔间隔滚筒设置在工作位置;通过对套管柱内表面的冲击,它可以在套管流动的整个间隔内或在几个单独的区域内铺开而膨胀。在推出时,在套管柱的壁上会产生过大的应力,以便通过增厚水泥来增强套管后的水泥,此时,在工作位置中推出装置的直径应选择为4-8.5%大于膨胀前套管柱的内径。效果:加快修复过程,减少了操作次数; 3 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号