CONSTRUCTION METHOD OF PILE-SLAB FOUNDATION OF HIGH-RISE BUILDING

机译:高层建筑桩板基础施工方法

摘要

FIELD: construction.;SUBSTANCE: construction method of pile-slab foundation of high-rise building includes excavation of pits and piling field with subsequent concreting of foundation slab. Piling field is constructed over the entire area of the pit made of bored or driven piles of the same length, after that the jacks are installed on each pile of the central zone of pit and load of value equal to 0.8-1.0 of the estimated load is applied by turn on pile, followed by removal of load after conditional stabilisation of the pile settlement to equalise the stiffness coefficient between the piles of the central and peripheral zones of foundation slab.;EFFECT: increase of the load-carrying ability of the foundation under the high-rise building, reduction of labour coefficient of its construction and materials consumption.;1 ex, 2 dwg
机译:领域:施工;实体:高层建筑桩板基础的施工方法包括开挖坑和打桩场,然后浇筑基础板。在由相同长度的钻孔或打入桩构成的整个坑区域上建造打桩场,然后将千斤顶安装在坑中心区域的每个桩上,其载荷等于估计载荷的0.8-1.0通过依次打桩施加桩,然后在有条件地稳定桩沉降后移去载荷,以使基础板中心区域和外围区域的桩之间的刚度系数相等。;效果:增加了基础的承载能力在高层建筑中,减少了建筑的劳动系数和材料消耗。; 1 ex,2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号