首页> 外国专利> METHOD OF COMBINED DEVELOPMENT OF FLAT SEAMS OF COAL DEPOSITS

METHOD OF COMBINED DEVELOPMENT OF FLAT SEAMS OF COAL DEPOSITS

机译:煤层扁平煤层联合开发方法

摘要

FIELD: mining operations.;SUBSTANCE: invention relates to mining, in particular to the combined development of flat seams of coal deposits. Simultaneously with the drilling and development workings at the border of the mine field the transport working is passed, from which the development workings are passed, contouring the extraction column with the counter headways, and also a mounting chamber is prepared for the mechanized complex, in which it is delivered and assembled. The extraction of column is carried out after connecting the development workings. Other columns are prepared in a similar technology.;EFFECT: reducing the time gap between the open and underground mining operations, as well as reduction of operational losses of coal.;1 dwg
机译:技术领域本发明涉及采矿,尤其涉及煤沉积层平煤层的联合开发。与矿场边界的钻探和开发工作同时进行,运输工作从中通过,开发工作从中通过,使抽油塔具有逆时针的轮廓,并为机械化的联合体准备了一个安装室,用于交付并组装。连接开发工作后进行柱的提取。其他柱子也用类似的技术制备。效果:减少露天和地下采矿作业之间的时间间隔,并减少煤炭的作业损失。1dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号