首页> 外国专利> COMBINED WORKING OF STEEP MINERALS DEPOSITS NEARBY WATER STRUCTURES

COMBINED WORKING OF STEEP MINERALS DEPOSITS NEARBY WATER STRUCTURES

机译:临近矿床的矿藏的综合处理

摘要

FIELD: mining.SUBSTANCE: claimed process comprises erection at open pit bottom of ore pad with impervious loam-film screen, deriving of drain brines via water discharge gallery for safe working of underlying mineral reserves. Note here that protective pillar is extracted and composed of the mineral and replaced with artificial pillar of the filling material. Replacement is executed simultaneously with excavation in open pit at no danger of water inrush from the pit into underground working while said artificial pillar is stabilised and dome-shaped.EFFECT: ruled out water inrush, loss of minerals in separation pillar and decreased time break between open and underground working.2 dwg
机译:技术领域:所要求保护的过程包括在具有不透水的壤土膜筛的矿床的露天矿井底部架设,通过排水通道导出排泄盐水以安全开采潜在的矿藏。请注意,保护柱是由矿物提取并组成的,并由填充材料的人造柱代替。更换是在露天矿中进行的同时进行,不会有水从坑中涌入地下工作的危险,而该人造石柱则是稳定的且呈圆顶状。开放和地下工作2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号