首页> 外国专利> ON-DEMAND MULTIPLE POWER SOURCE MANAGEMENT SYSTEM, ON-DEMAND MULTIPLE POWER SOURCE MANAGEMENT SYSTEM PROGRAM AND COMPUTER-READABLE RECORDING MEDIUM ON WHICH SAID PROGRAM IS RECORDED

ON-DEMAND MULTIPLE POWER SOURCE MANAGEMENT SYSTEM, ON-DEMAND MULTIPLE POWER SOURCE MANAGEMENT SYSTEM PROGRAM AND COMPUTER-READABLE RECORDING MEDIUM ON WHICH SAID PROGRAM IS RECORDED

机译:记录了所述程序的按需多重电源管理系统,按需多重电源管理系统程序和计算机可读记录介质

摘要

An object of the present invention is to provide an on-demand control system that supplies power to electric devices based on not predetermined priorities fixed to electric devices, but based on priorities changed according to the use status of the user. The on-demand control system can control supply of power of a commercial power source in real time in response to a power request necessary for the user and controls the supply of power according to the QoL necessary for the user through daily life. The on-demand power control system of the present invention is a multiple power source management system for an on-demand power control system, the on-demand power control system including: a plurality of power sources; a plurality of electric devices; smart taps connected to the electric devices; a multiple power source management apparatus that includes a memory and that controls supply of power to the electric devices; and a network for the multiple power source management apparatus connected through the smart taps, wherein the multiple power source management apparatus includes: power supply plan generation means for setting a power use plan of a commercial power source as initial values of a supply plan of a capacitor, searching a time zone with a maximum dissatisfaction among the time zones of the initial values to set the time zone as a time-shift destination, searching a time zone with a minimum dissatisfaction to set the time zone as a time-shift source, and repeating the process until the dissatisfaction of the time-shift destination is smaller than the dissatisfaction of the time-shift source to generate a power supply plan; supply power target value update means for setting a target value of supply power for each of the plurality of power sources and feeding back and updating an error between actual power supply amount and the supply power target value at each minimum control interval; and power and power source arbitration means for repeating a process of selecting a device with a minimum priority among an electric device that has requested power and electric devices in operation, selecting a power source with a maximum power source load factor, reducing or stopping power of the electric device, and reducing supply power of the power source by an amount of the reduced power until the following Expressions (1) and (2) are satisfied, thereby arbitrating the power and the power sources to satisfy Expressions (1) and (2) at the same time.
机译:本发明的目的是提供一种按需控制系统,其不是基于固定在电气设备上的预定优先级而是基于根据用户的使用状态而改变的优先级来向电气设备供电。随需控制系统可以响应于用户所需的电力请求而实时控制商用电源的电力供应,并根据用户在日常生活中所需的QoL来控制电力供应。本发明的按需电力控制系统是用于按需电力控制系统的多电源管理系统,该按需电力控制系统包括:多个电源;和多个电子设备;连接到电气设备的智能水龙头;多电源管理装置,其包括存储器并且控制向电子设备的电力供应;以及通过智能接头连接的多电源管理装置的网络,其中,多电源管理装置包括:电源计划生成装置,用于将商用电源的电力使用计划设置为电源的电源计划的初始值。电容器,在初始值的时区中搜索最大不满意的时区以将该时区设置为时移目的地,搜索最小不满意的时区以将该时区设置为时移源,重复该过程,直到时移目的地的不满小于时移源的不满为止,以生成供电计划;供电目标值更新装置,用于设定多个电源中的每一个的供电目标值,并且在每个最小控制间隔处反馈并更新实际供电量与供电目标值之间的误差;以及电源和电源仲裁装置,用于重复以下步骤:在请求电力的电气设备和运行中的电气设备中,选择优先级最低的设备,选择电源负载因数最大的电源,降低或停止电源消耗。电气设备,并且将电源的供应功率减小减少的功率的量,直到满足以下表达式(1)和(2)为止,从而对电源和电源进行仲裁以满足表达式(1)和(2) ) 与此同时。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号