CONVERTER BLOWING END TIME OBJECTIVE MOLTEN STEEL TEMPERATURE SET DEVICE AND METHOD THEREFOR

机译:转炉吹炼终点目标钢水温度设定装置及方法

摘要

PROBLEM TO BE SOLVED: To set a proper converter blowing end time objective molten steel temperature by correctly obtaining a heat release amount from a molten steel after tapping to a ladle.;SOLUTION: When a molten steel blown by a converter is fed to a continuous casting machine through a secondary refining device, a converter blowing end time objective molten steel temperature is set by a computer system 5. A ladle temperature distribution state calculation part 7 continuously calculates the temperature distribution state to the thickness direction of the ladle by performing continuous heat transfer calculation in accordance with the using conditions of the ladle, reads the same, sets the converter blowing end time molten steel temperature in the heat transfer calculation, estimates the molten steel temperature by heat transfer calculation using an operation schedule and conveyance schedule in each process from the converter blowing end to the start of continuous casting, the converter blowing end time molten steel temperature and temperature distribution conditions to a ladle thickness direction, and, when a molten steel temperature difference between the estimated continuous casting start time molten steel temperature and continuous casting start time required molten steel temperature lies within a molten steel temperature difference allowance range, a fixed value is added to the converter blowing end time molten steel temperature, and it is set to a converter blowing end time objective molten steel temperature.;SELECTED DRAWING: Figure 2;COPYRIGHT: (C)2017,JPO&INPIT
机译:解决的问题:通过正确地将钢水浇到钢包后从钢水中释放热量来设置合适的转炉吹炼结束时间目标钢水温度;解决方案:将由转炉吹炼的钢水连续喂入铸造机通过二次精炼装置,通过计算机系统5设定转炉吹出结束时间目标钢水温度。钢包温度分布状态计算部7通过连续加热来连续计算钢包厚度方向的温度分布状态。根据钢包的使用条件进行传热计算,读取钢水,在传热计算中设定转炉吹炼结束时间钢水温度,并使用每个工序的运行时间表和输送时间表通过传热计算估算钢水温度从转炉吹炼结束到开始连铸,转炉在钢包厚度方向上的吹炼结束时间钢水温度和温度分布条件,并且当钢水的估计连铸开始时间与连铸开始时间之间的钢水温度差在钢水温度之内时差允许范围,将固定值添加到转炉吹炼结束时间钢水温度,并将其设置为转炉吹炼结束时间目标钢水温度。;选图:图2;版权:(C)2017,JPO&INPIT

著录项

  • 公开/公告号JP2016180127A

    专利类型

  • 公开/公告日2016-10-13

    原文格式PDF

  • 申请/专利权人 JFE STEEL CORP;

    申请/专利号JP20150059698

  • 发明设计人 TAKAGI HIROMASA;KUYAMA SHUJI;ASANO KAZUYA;

    申请日2015-03-23

  • 分类号C21C5/30;B22D11/10;B22D11/12;C21C5/46;

  • 国家 JP

  • 入库时间 2022-08-21 14:47:17