首页> 外国专利> POWER GENERATING UNIT OPERATION PLAN ESTABLISHMENT SYSTEM AND POWER GENERATING UNIT OPERATION PLAN ESTABLISHMENT METHOD

POWER GENERATING UNIT OPERATION PLAN ESTABLISHMENT SYSTEM AND POWER GENERATING UNIT OPERATION PLAN ESTABLISHMENT METHOD

机译:发电单元运行计划建立系统及发电单元运行计划建立方​​法

摘要

PROBLEM TO BE SOLVED: To provide a power generating unit operation plan establishment system and power generating unit operation plan establishment method that make it possible to establish a profitable operation plan.SOLUTION: A power generating unit operation plan establishment system establishes an operation plan for a power generating unit capable of executing any operation mode of a power selling operation mode, no-load operation mode, and stop mode. The power generating unit operation plan establishment system compares a predicted power selling price with a power generation cost to determine whether or not the predicted power selling price is higher than the power generation cost; and, on the basis of a result of the determination, establishes the operation plan by calculating loss indexes according to the following formula (1), with respect to the power selling operation mode, no-load operation mode, and stop mode in a loss period in which the predicted power selling price is equal to or lower than the power generation cost, and selecting an operation mode having the lowest loss index. Loss index=(power selling loss)+(maintenance loss)+(operation loss not contributing to poser selling)...(1).SELECTED DRAWING: Figure 6
机译:要解决的问题:提供一种发电机组运行计划建立系统和发电机组运行计划建立方​​法,以使建立有利可图的运行计划成为可能。能够执行售电运行模式,空载运行模式和停止模式中的任何运行模式的发电单元。发电单元运行计划建立系统将预测的销售价格与发电成本进行比较,以确定预测的销售价格是否高于发电成本。根据确定的结果,针对损耗中的售电运行模式,空载运行模式和停止模式,通过根据下式(1)计算损耗指标来建立运行计划。在预测的电力销售价格等于或低于发电成本的期间内,选择损耗指数最低的运转模式。损耗指数=(电力销售损失)+(维护损失)+(操作损失对装具销售者无益)...(1)。选择的图纸:图6

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号