首页> 外国专利> COMPUTING SESSION WORKLOAD SCHEDULING AND MANAGEMENT OF PARENT-CHILD TASKS

COMPUTING SESSION WORKLOAD SCHEDULING AND MANAGEMENT OF PARENT-CHILD TASKS

机译:家长工作的计算机会话工作量计划和管理

摘要

A single workload scheduler schedules sessions and tasks having a tree structure to resources, wherein the single workload scheduler has scheduling control of the resources and the tasks of the parent-child workload sessions and tasks. The single workload scheduler receives a request to schedule a child session created by a scheduled parent task that when executed results in a child task; the scheduled parent task is dependent on a result of the child task. The single workload scheduler receives a message from the scheduled parent task yielding a resource based on the resource not being used by the scheduled parent task, schedules tasks to backfill the resource, and returns the resource yielded by the scheduled parent task to the scheduled parent task based on receiving a resume request from the scheduled parent task or determining dependencies of the scheduled parent task have been met.
机译:单个工作负载调度器将具有树结构的会话和任务调度到资源,其中,单个工作负载调度器具有对资源以及父子工作负载会话和任务的任务的调度控制。单个工作负载调度程序接收一个请求,以调度由已调度的父任务创建的子会话,该子会话在执行时会导致子任务。计划的父任务取决于子任务的结果。单个工作负载调度程序从调度的父任务接收消息,该消息根据调度的父任务未使用的资源产生资源,调度任务以回填资源,并将调度的父任务产生的资源返回给调度的父任务基于从调度的父任务接收恢复请求或确定已满足调度的父任务的依赖关系。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号