IMPACT OF UNPLANNED LEAVES ON PROJECT COST

机译:计划外叶子对项目成本的影响

摘要

An unplanned leave manager is provided that predicts the impact of unplanned leaves on a project. Historical unplanned leave data corresponding to one or more project team members is provided. The manager determines, for each of the project team members, a mean time between unplanned leaves and a rate of unplanned leaves based on the member's corresponding historical unplanned leave data. The manager predicts a cost impact of future unplanned leaves of the project team members, based on at least one of: the mean time between unplanned leaves; and the rate of unplanned leave. The manager selects one or more of the project team members based, at least in part, on at least one of: the determined mean time between unplanned leaves; the determined rate of unplanned leaves; or the predicted cost impact. The manager then staffs the project with the selected members.
机译:提供了一个计划外的休假经理,该经理预测计划外的休假对项目的影响。提供了与一个或多个项目团队成员相对应的历史计划外休假数据。经理根据项目成员的相应历史非计划休假数据,为每个项目团队成员确定非计划休假之间的平均时间和非计划休假率。经理基于以下至少一项来预测项目团队成员未来计划外休假的成本影响:以及计划外休假的比率。经理至少部分地基于以下至少一项选择一个或多个项目团队成员:确定的计划外休假之间的平均时间;以及确定的计划外叶子比率;或预计的成本影响。然后,经理将项目与选定的成员一起配备。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号