首页> 外国专利> Well insulation and fracture prevention

Well insulation and fracture prevention

机译:井保温和防裂

摘要

A downhole Tool includes a Housing coupled to a Shaft Seal device, a pressure Actuated Valve disposed within the Housing and has a First piston that is ready to move in a First Chamber of pistonWhere the first piston coupled to a means of Transport, so that the tension in the Transport Medium is transmitted to the first piston, wherein, when reducing the strain on the means of Transport,The First piston moves into the first Chamber of the piston so that the wellbore Fluids have the ability to enter the first Chamber piston and a pressure Actuated Valve disposed within the Housing and has a Second piston is ready for af. Tie itself within a second Chamber for placing the second piston piston Chamber in communication of FLRun off with the first piston Chamber, where a Pressure drop through the downhole tool allows the second piston Moves so that the wellbore Fluids pass to the second Chamber and piston Through Hole Device isolation.
机译:井下工具包括连接至轴封装置的壳体,设置在壳体内的压力致动阀,并且具有准备在活塞的第一腔室中运动的第一活塞,其中第一活塞连接至运输工具,使得传输介质中的张力会传递到第一活塞,其中,当减小运输工具上的应变时,第一活塞会移动到活塞的第一腔室中,从而使井筒流体能够进入第一腔室活塞并设置在壳体内并具有第二活塞的压力驱动阀已准备就绪。将自己绑在第二腔室中,以使第二活塞活塞腔室与第一活塞腔室通过FLRun连通,在此处,通过井下工具的压降使第二活塞运动,从而使井筒流体通过第二腔室和活塞孔设备隔离。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号