首页> 外国专利> DELAY, COST AND WASTAGE POTENTIAL

DELAY, COST AND WASTAGE POTENTIAL

机译:延迟,成本和浪费潜力

摘要

Delays, cost and wastage control in the construction projects are often unavoidable circumstances. Delays, increase in cost and wastage in a construction projects occurs due to the insufficiency of man power, improper procurement of materials, defects in machinery, environmental aspects, lack of co-ordination, quality issues, sudden increase in cost, misuse of material etc. The modeling for delay, cost and wastage analysis in the construction of building assumes greater complexity due to the involvement of human perception in the evolution of decision making process. Further, the complex human perception is subjected to the physical surroundings, social environment and also to its own household structure over and above the economic constraints. The calculation of delay, cost and wastage in the construction of building has a major bearing on the human decisions regarding an importance of the construction activities. Both the decision processes are complex with higher degree of subjectivity involved and therefore call for the analytical tools which can imitate this behavior and bring the results close to the reality. In the present invention the Fuzzy Rules are developed to calculate potential of delay, cost and wastage in the construction of building.
机译:建设项目中的延误,成本和浪费控制通常是不可避免的情况。由于人力不足,材料采购不当,机械缺陷,环境因素,缺乏协调,质量问题,成本突然增加,材料滥用等,导致建设项目的延误,成本增加和浪费。 。由于建筑过程中人类感知的参与,建筑物建造中的延迟,成本和浪费分析的建模假设更为复杂。此外,复杂的人类感知不仅受到经济限制,还受到自然环境,社会环境以及其自身家庭结构的影响。建筑物建造中的延误,成本和浪费的计算与人为决定建造活动的重要性有很大关系。这两个决策过程都是复杂的,涉及较高的主观性,因此需要使用可模仿这种行为并使结果接近实际的分析工具。在本发明中,开发了模糊规则以计算建筑物建造中的延迟,成本和浪费的可能性。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号