METHOD FOR CONSTRUCTING EXTRA-LARGE VARIABLE CROSS SECTION TUNNEL

机译:超大变截面隧道的施工方法

摘要

A method for constructing an extra-large variable cross section tunnel. The method comprises: excavating left pilot tunnels (11) and timely constructing primary supports and temporary supports; packing large boot-shaped wall feet (13) and constructing right pilot tunnels (12) by the same process; excavating the upper half part of the left side of a main tunnel (2) and timely constructing first-layer primary supports (23), temporary vertical braces (91) and temporary inverted arches; excavating the lower half part of the left side of the main tunnel (2) and timely constructing the first-layer primary supports (23) and the temporary vertical braces (91); constructing the upper half part of the right side of the main tunnel by the same process, and excavating a middle arch part and timely constructing the first-layer primary supports; constructing second-layer primary supports (24) and removing the temporary braces and the temporary inverted arches of the arch part; excavating a central part and timely constructing primary supports (8) of the inverted arches; removing the temporary supports (17) of the left and right lower pilot tunnels, packing the secondary lining of the inverted arches, and filling the bottom of the tunnel; and finally one-time packing the secondary lining (22) of the arch wall by means of a model board trolley. The construction method effectively reduces the safety risk of removing the temporary supports, increases the operation freedom degree and accelerates the construction schedule.
机译:一种构造超大变截面隧道的方法。该方法包括:开挖左导引隧道(11)并及时建造主要支护和临时支护;打包大靴形墙脚(13),并用相同的方法建造右引导隧道(12);挖掘主隧道(2)左侧的上半部分,及时修建第一层初级支护(23),临时竖向支撑(91)和临时倒拱。开挖主隧道(2)左侧下半部分,及时建造第一层初级支护(23)和临时竖向支撑(91);用同样的方法建造主隧道右侧的上半部分,开挖中拱部分,及时建造第一层一级支护。构造第二层主支撑件(24),并去除拱形部分的临时支撑和临时倒拱。挖掘中心部分并及时建造倒拱的主要支撑(8);拆除左右下部引水隧洞的临时支座(17),堆砌倒拱的次衬层,并填满隧道的底部;最后一次通过样板车将拱壁的次衬(22)打包一次。该施工方法有效降低了拆除临时支架的安全风险,提高了操作自由度,加快了施工进度。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号