首页> 外国专利> METHOD TO CONTROL HYDRATE FORMATION PROCESS IN GAS-GATHERING FLOW LINES CONNECTED TO COMMON MANIFOLD AT FAR NORTH GAS AND GAS CONDENSATE DEPOSITS

METHOD TO CONTROL HYDRATE FORMATION PROCESS IN GAS-GATHERING FLOW LINES CONNECTED TO COMMON MANIFOLD AT FAR NORTH GAS AND GAS CONDENSATE DEPOSITS

机译:北方北部天然气与凝析油矿床连通歧管的集气流管线中水合物形成过程的控制方法

摘要

FIELD: oil and gas industry.;SUBSTANCE: in the method to control hydrate formation process in gas-gathering flow lines connected to common manifold at the Far North gas and gas condensate deposits that includes determination of commencement of hydrate formation process in the flow line by controlling temperature of gas coming to entry of gas processing plant (GPP) from the flow line and comparison of its behaviour dynamics with dynamics of design temperature as well as delivery of inhibitor to well pads through a separate pipeline, according to the invention to the database of automatic process control system of GPP (GPP APCS) maximum values of potential pressure at each well are entered on regular basis, and these values are determined according to results of gas-hydrodynamic survey of wells, and with use of telemetry continuous measurement or measurement with the preset quantisation increment is carried out for basic parameters of well pads, their flow lines and gas-gathering manifold, and for each well time function curve is plotted according to results of gas pressure measurements at the well mouths, and as soon as by means of GPP APCS commencement of hydrate formation process is detected in gas-gathering flow-line accompanied by pressure increase in all wells either inhibitor is delivered to the well pad or to inhibitor delivery point with less distance from GPP, and when pressure is increased at certain wells only then by means of GPP APCS mode of pressure changes is started at mouth of each such well in order to determine where pressure is increased or approaching its maximum permitted value at the mouth, and against this parameter section of the flow-line -gas-gathering manifold system hydrates are formed, thereafter inhibitor is delivered to the well, which is located right upstream the section with commenced hydrate formation.;EFFECT: improved efficiency of the method due to possible delivery of inhibitor to the required point of the gas-gathering flow-line.;2 dwg
机译:领域:在控制与远北地区天然气和凝析气沉积物的共同歧管相连的集气流水线中水合物形成过程的方法中,该方法包括确定流水线中水合物形成过程的开始根据本发明,通过控制从流水线进入气体处理厂(GPP)的气体的温度,并将其行为动力学与设计温度的动力学进行比较,以及通过独立的管道将抑制剂输送到井垫,定期输入GPP(GPP APCS)自动过程控制系统(GPP APCS)的数据库,并根据遥测井的气液动力学调查结果,并使用遥测连续测量或使用预设的量化增量对井垫,其流线和集气样板的基本参数进行测量d,并根据井口处气压测量的结果绘制每条井时间函数曲线,并借助GPP APCS在集气流线中检测到水合物形成过程的开始并伴有压力增加在所有井中,抑制剂被输送至井垫或与GPP的距离较小的抑制剂输送点,并且当某些井中的压力升高时,只有借助GPP APCS模式,压力变化才会在每个井的口处开始。为了确定压力在何处增加或接近其最大允许值,并针对流水线-集气歧管系统的此参数部分形成水合物,然后将抑制剂输送至位于上游的油井效果:由于可能将抑制剂输送到集气流网的所需位置而提高了方法的效率e。; 2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号