首页>
外国专利>
Start - template in the scale 1: 1 for the construction site, after taking over the extent from the architects - plans, in connection of the heights ordinate, ü. From the local measurement of office nhn
Start - template in the scale 1: 1 for the construction site, after taking over the extent from the architects - plans, in connection of the heights ordinate, ü. From the local measurement of office nhn
The dependent claim relates to the start template (1) 1 on the construction site on a scale of 1: 1 system w. a. with all of the points designated, in order to a one hundred percent safety, in the embodiment, to ensure.Characterized by thethe the 1 a start template (1) on the construction site on a scale of 1: 1 system w. a. (portable) with the dimensions of1,60 m long 0,30 m wide5 mm thick / stronglyfor use, is present.On the start template (1) (portable), the following numberings, fixed for the ec.(1) Start template in the scale 1: 1 system w. a. (1,60 m × 0,30 m × 5 mm)(2) Meter point in the ec: (1,00 m above okff / + / – 0,00 in the ec)(3) Designates the okff (the upper edge of the finished floor) of the with + / – 0,00 in the ec in the architects / section, was specified.(4) Designates the ok - bare ceiling in the ground floor.(5) Of the template should be at the top (5) and at the bottom (5), each with a screw, to secure against slipping, in the squared timber (7) are fixed.(6) Shows a nail hole in the stencil (1) for the suspension of the jig to the fixed point / nail (6a)(6a) shows the nail / pin which, from the local country surveyor mentioned heights ordinate / fixed point u. nhn.(7), The squared timber is indicated (7) for receiving the heights ordinate ü. nhn / fixed point / nail / crack (6a) of the local country water measuring machine.
展开▼