首页>
外国专利>
BAR ARRANGEMENT METHOD IN ENLARGED-BOTTOM PART OF CAST-IN-PLACE ENLARGED-BOTTOM PILE AND CREATION METHOD OF PILE USING THE BAR ARRANGEMENT METHOD
BAR ARRANGEMENT METHOD IN ENLARGED-BOTTOM PART OF CAST-IN-PLACE ENLARGED-BOTTOM PILE AND CREATION METHOD OF PILE USING THE BAR ARRANGEMENT METHOD
展开▼
机译:现浇大底桩扩底部分的钢筋布置方法及采用钢筋布置方法的桩的制作方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a bar arrangement method in an enlarged-bottom part of a cast-in-place enlarged-bottom pile capable of managing the lower side expansion of a reinforced cage for the enlarged-bottom pile on the ground, and a creation method of the enlarged-bottom pile using the bar arrangement method.;SOLUTION: A reinforcement bar 7 is closed on the side of a hoop nonexistent area part 6, and a reinforced cage 1 for an enlarged-bottom pile is suspended by a suspension member 18, and is lowered in a drilling hole 34 of the ground 35. A body reinforcement part 2 is arranged in a vertical hole 32, and an enlarged-bottom reinforcement part 3 is arranged in an enlarged-bottom hole 34. When pulling up a suspension member 10, a connection part 16 rises in response to rising of a lifting member 9 while being guided by a main reinforcement 4 of the hoop nonexistent area part 6, and a support reinforcement 11 pushes out the connection part 17 to the outside in the radial direction of the hoop nonexistent area part 6. Since the reinforcement bar 7 is expanded in an enlarged-bottom shape to the outer side in the radial direction than the hoop nonexistent area part 6 with the connection part 8 as the rotational center via a support reinforcement 11, an operator can manage the expansion of the reinforcement bar 7 by confirming a pull-up quantity of the suspension member 10 on the ground. After this bar arrangement method, concrete is poured into the drilling hole, so that an enlarged-bottom part becomes planned strength.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2017,JPO&INPIT
展开▼