PROBLEM TO BE SOLVED: To provide a construction method that uses a spacer-cum-permanent mold dismantled as soon as concrete of a reinforced concrete beam solidifies.;SOLUTION: A support post 51 is erected. A spacer-cum-permanent mold 30 is held with a dam part 31 facing downward, and the dam part 31 is installed on a top end of the support post 51. An assembled reinforcement body 20 having a main reinforcement 21 and a shear auxiliary reinforcement 22 is installed on a reinforcement receiving part 32. A bottom mold 41 is fitted on the dam part 31 such that the dam part 31 closes an opening 41a formed on the bottom mold 41. A side mold 42 is erected on an edge part on both sides of the bottom mold 41. Concrete is cast in an area surrounded by the bottom mold 41 and the side mold 42, such that a top part of the dam part 31 and the reinforcement receiving part 32 are embedded in the concrete.;SELECTED DRAWING: Figure 5;COPYRIGHT: (C)2017,JPO&INPIT