首页> 外国专利> Hot metal method of transportation in hot metal processing plant and the rolling furnace plant with a dephosphorization furnace of 2 groups

Hot metal method of transportation in hot metal processing plant and the rolling furnace plant with a dephosphorization furnace of 2 groups

机译:铁水处理厂和带2组脱磷炉的轧钢厂的铁水运输方法

摘要

PROBLEM TO BE SOLVED: To provide a method for conveying molten iron between a molten iron processing plant including two dephosphorization furnaces and a converter plant, by which production in the dephosphorization furnace is not disturbed by improving the conveying efficiency of the molten iron ladle even when the molten iron processing plant and the converter plant are present in plants of separate buildings, and by which the molten iron ladles can be conveyed efficiently while maintaining the productivity.SOLUTION: The method for conveying molten iron comprises: lifting an empty ladle mounted on a conveying truck stopped at a first departure and arrival station by a dephosphorization furnace molten iron tapping side crane; moving the conveying truck toward a second departure and arrival station after the dephosphorization furnace molten iron tapping side crane has lifted the empty ladle; moving the dephosphorization furnace molten iron tapping side crane having lifted the empty ladle toward a first receiving and delivering station from the first departure and arrival station; mounting the empty ladle to a first receiving truck of the first receiving and delivering station by the dephosphorization furnace molten iron tapping side crane after arrival of the dephosphorization furnace molten iron tapping side crane having lifted the empty ladle at the first receiving and delivering station; and moving the first molten iron receiving truck mounted with the empty ladle to the first molten iron tapping station from the first receiving and delivering station.
机译:解决的问题:提供一种在包括两个脱磷炉的铁水处理厂和转炉之间输送铁水的方法,通过该方法即使提高了铁水罐的输送效率,也不会影响脱磷炉的生产。解决方案:输送铁水的方法包括:提起安装在炉膛上的空钢包,该铁水包和转炉厂位于不同建筑物的工厂中,通过它们可以有效地输送铁水包,同时保持生产率。由脱磷炉铁水出铁侧起重机停在第一起运到达站的运输车。在脱磷炉铁水出铁侧起重机将空钢包提起后,将运输车移向第二个出站。使已经将空钢包提起的脱磷炉铁水出铁侧起重机从第一出发和到达站移向第一接收和传送站;在将脱气钢包提升到第一接收和输送站的脱磷炉铁水侧起重机到达之后,通过除磷炉铁水侧起重机将空钢包安装到第一接收和输送站的第一接收卡车。将装有空钢包的第一铁水接收车从第一接收和输送站移至第一铁水出铁站。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号