摘要

In a transmission line to which a large number of devices are connected, the presence or absence of device malfunction due to a voltage drop in the transmission line is checked, and the power supply voltage is switched in two stages. A master station that transmits control signals for a plurality of control target devices and a plurality of slave stations connected to each of the plurality of control target devices are connected to a transmission line for control signals. In the slave station, the first operation is performed when the current value of the current or voltage of the control target device is a first operation failure state that is smaller than a first threshold value that is a current or voltage value required for the ON operation of the control target device. When a failure signal is output and is smaller than a second threshold value that is a current or voltage value necessary for the ON operation holding state, the second operation failure signal is output. In addition, the slave station recovers the power supply voltage obtained from the transmission line with less power consumption than the first voltage necessary for the ON operation of the control target device or the first voltage necessary and sufficient for the ON operation holding state. Output as a second voltage higher than the voltage.
机译:在连接有大量设备的传输线中,检查由于传输线中的电压降引起的设备故障的存在与否,并且将电源电压分为两级进行切换。传送用于多个控制目标设备的控制信号的主站和连接到多个控制目标设备中的每一个的多个从站被连接到用于控制信号的传输线。在从站中,当控制目标设备的电流或电压的当前值是第一操作失败状态时执行第一操作,该第一操作失败状态小于作为接通操作所需的电流或电压值的第一阈值。控制目标设备。当输出故障信号并且小于第二阈值时,该第二阈值是导通操作保持状态所需的电流或电压值,则输出第二操作故障信号。另外,从站以比控制对象装置的ON操作所需的第一电压或ON操作保持状态所需的足够的第一电压小的电力消耗来恢复从传输线获得的电源电压。作为高于该电压的第二电压输出。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号