首页> 外国专利> Hot metal dephosphorization method with high iron yield

Hot metal dephosphorization method with high iron yield

机译:高铁产量的铁水脱磷方法

摘要

PROBLEM TO BE SOLVED: To increase an iron yield after dephosphorization treatment for hot pig iron by a converter type vessel.SOLUTION: When dephosphorization treatment for hot pig iron is performed in a converter type vessel, in a step where [Si] in the hot pig iron is 0.10 mass% or higher, the first charge energy is controlled to 500 to 3,000 W/t, the second charge energy is controlled to 400 to 2,000 W/t, and 0.5/3 is satisfied, and, in a step where the [Si] in the hot pig iron reaches a stage of exceeding 0.00 mass% and below 0.10 mass%, the first charge energy is reduced by 300 W/t or more, and further, the second charge energy is increased by 200 W/t or more, thus the first charge energy is controlled to 50 to 400 W/t, the second charge energy is controlled to 1,000 to 3,000 W/t, and 0.02/0.3 is satisfied.
机译:解决的问题:通过转炉型容器对生铁进行脱磷处理后,提高铁的产率。解决方案:在转炉型容器中对生铁进行脱磷处理时,在[Si]生铁为0.10质量%以上,第一充电能量控制为500〜3000W / t,第二充电能量控制为400〜2000W / t,满足0.5 / 3,生铁中的[Si]达到超过0.00质量%且低于0.10质量%的阶段,第一充电能量降低300W / t以上,进一步,第二充电能量提高200W / t。 t或更大,因此将第一充电能量控制为50至400W / t,将第二充电能量控制为1,000至3,000W / t,并且满足0.02 / 0.3。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号