首页> 外国专利> Test and monitoring system for a sump pump installation having a variable test cycle time out

Test and monitoring system for a sump pump installation having a variable test cycle time out

机译:具有可变测试周期超时的污水泵安装的测试和监视系统

摘要

An automated system for monitoring and testing a sump pump installation includes an electrically-actuated valve which admits liquid into the liquid container in response to a valve control signal. A test control module supplies a valve control signal to initiate a test cycle during which liquid is admitted to the container to cause the liquid level in the container to rise after which the pump, if functional, discharges liquid from the container and the test cycle is terminated. The test control module includes a timer circuit which, if the test cycle is not terminated by the pump, terminates the test cycle and terminates application of the valve control signal to the valve after a predetermined time out period following initiation of the test cycle. The test control module further includes an indicator circuit which indicates upon termination of the test cycle whether the test was successful or unsuccessful. In one embodiment the timeout period of the test cycle is dependent on the flow rate of liquid through the conduit.
机译:用于监视和测试污水泵设备的自动化系统包括电动阀,该电动阀响应于阀控制信号使液体进入液体容器。测试控制模块提供阀控制信号以启动测试循环,在此循环期间,液体被接纳到容器中,从而导致容器中的液位上升,此后泵(如果运行)从容器中排出液体,并且测试循环为终止。测试控制模块包括定时器电路,如果测试周期没有被泵终止,则该定时器电路终止测试周期,并在启动测试周期后的预定超时时间之后终止向阀施加阀控制信号。测试控制模块还包括指示器电路,该指示器电路在测试周期终止时指示测试是成功还是失败。在一个实施例中,测试周期的超时时间取决于通过导管的液体的流速。

著录项

  • 公开/公告号US9528523B2

    专利类型

  • 公开/公告日2016-12-27

    原文格式PDF

  • 申请/专利权人 BEACON TECHNICAL SYSTEMS LLC;

    申请/专利号US201414491263

  • 发明设计人 EUGENE M. CUMMINGS;

    申请日2014-09-19

  • 分类号F04D15;F04D13/08;F04D13/12;F04D15/02;G01F23/74;

  • 国家 US

  • 入库时间 2022-08-21 13:42:34

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号