首页> 外国专利> A method of installing a pile in the sea bottom by means of a pile guide.

A method of installing a pile in the sea bottom by means of a pile guide.

机译:一种通过桩导向器将桩安装在海底中的方法。

摘要

In a method of installing a pile in the sea bottom by means of a pile guide which has a frame and at least an upper and a lower pair of cooperating guide members, wherein the upper pair and the lower pair are located at a distance from each other in vertical direction, wherein each pair of guide members comprises a passive guide member and an active guide member, the passive guide member and the active guide member are moved towards the pile after placing the pile between each of the pairs of guide members. The passive guide members are moved to respective fixed initial guiding positions with respect to the frame and the active guide members are moved to the pile until the passive and the active guide members engage the pile, after which the pile is hold between the upper pair of guide members and between the lower pair of guide members during driving the pile into the sea bottom, during which the actual forces between the pile and the respective guide members are determined.
机译:在一种通过桩引导器将桩安装在海底中的方法中,该桩引导器具有框架以及至少一对上和下对协作引导构件,其中上对和下对彼此相距一定距离。另一方在竖直方向上,其中每对引导构件包括被动引导构件和主动引导构件,在将桩放置在每对引导构件之间之后,被动引导构件和主动引导构件朝向桩移动。被动引导构件相对于框架移动至相应的固定初始引导位置,并且主动引导构件移动至桩,直到被动引导构件与主动引导构件接合桩,之后将桩保持在上部对之间。引导构件以及在将桩打入海底期间在下部对引导构件之间。在此期间,确定桩和各个引导构件之间的实际力。

著录项

  • 公开/公告号NL2015237B1

    专利类型

  • 公开/公告日2017-01-18

    原文格式PDF

  • 申请/专利权人 IHC IQIP UK LTD;

    申请/专利号NL20152015237

  • 发明设计人 JAMES EWART MILLIGAN MACK;

    申请日2015-07-29

  • 分类号E02D13/04;E02D27/52;

  • 国家 NL

  • 入库时间 2022-08-21 13:37:22

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号