首页> 外国专利> Arrangement of technological line for the production of load-bearing and structural elements for the furniture pieces with large cross-sections, preferably legs and load carrying beams and sills

Arrangement of technological line for the production of load-bearing and structural elements for the furniture pieces with large cross-sections, preferably legs and load carrying beams and sills

机译:布置技术生产线,以生产大截面家具件的承重和结构元件,最好是支腿以及承重梁和门槛

摘要

in the process line for the manufacture of carrier, and with a base station (1) are: first string feeders transport (a1), second string feeders transport (b1), third string feeders (c1) and a fourth sequence of transport transport feeders (d1).the first sequence of transport feeders (a1) is a set of machine tools, cnc milling fronts (2), which connects with the press menbranowo - vacuum (2.1), from where it goes to a set of unit heads, cnc drilling, milling and final treatment (6), then the first sequence at ajniku00f3w transport (a1) leads to the warehouse of finished products (10).the second string feeders transport (b1) is formaryzerko - czopiarki (3), which connects with the line to opu0142aszczawiania panels and panels (3.1). outlet line to opu0142aszczawiania panels and panels (3.1) the second string feeders transport (b1) branches in three directions. the first branch (b1.1) is the connection line to the obru00f3bczym to formatting records and cutting groove "v" (7) and is connected with the position u015bcisku00f3w to glue together and for wykroju00f3w pu0142ycin (7.1), where leads to the warehouse of finished products (10). warehouse of finished products (10) also operates out of line to opu0142aszczawiania panels and panels (3.1) branch of the second (b1.2).out of line to opu0142aszczawiania panels and panels (3.1) branch of the third (b1.3) second transport over the feeders (b1) connects it with base station (1). the third string feeders transport (c1) connects the base station (1) with a line for moulding and oklejania narrow planes (4).outlet line for moulding and oklejania narrow planes (4) third string feeders transport (c1) shall be allocated on the first (c1.1) leading to a set of unit heads, cnc drilling, milling and processing the final (6) and a second (c1.2) connecting line to f ormowania and oklejania narrow planes (4) with the warehouse of finished products (10).the fourth string feeders transport (d1) connects the base station (1) with strugarku0105 czterostronnu0105 (5) cooperating with a line to opu0142aszczowiania narrow elements (5.1). outlet line to opu0142aszczowiania narrow elements (5.1) fourth string feeders transport (d1) is distributed in three directions. dispenser situated in the first direction (d1).1) is the warehouse of finished products (10), a dispenser located in the second direction (d1.2) comes to the line to the edge beams and formatting cutting groove "v" (8), from where it goes to u015bcisku00f3w to glue together and for wykroju00f3w edge beams (8.1), and further comes to the warehouse of finished products (10). dispenser situated in the third direction (d1.3) is naku0142adarki flange to the narrow flange edges (8.2), from where it goes into the milling obwiedniowej (8.3). for frezarku0105 obwiedniowu0105 (8.3) either situated in the third direction (d1.3) has two arms, with which the first arm (d.1.3.1) comes into the line to the edge beams and formatting cutting groove "v" (8), and the second arm (d.1.3.2) feeder situated in third direction (d1.3) is warehouse of finished products (10).rozkrawarka film (9) is connected to the first podajnikiem (e1) of line to opu0142aszczawiania panels and panels (3.1) and podajnikiem second (e2) with line for moulding and oklejania narrow planes (4). rozkrawarka film (9) is connected to the third podajnikiem (e3) of line, to opu0142aszczowiania narrow elements (5.1).
机译:在生产线的生产线中,并带有一个基站(1),它们是:第一串进料器运输(a1),第二串进料器运输(b1),第三串进料器(c1)和第四运输进料运输器(d1)。运输进料器(a1)的第一序列是一组机床,即cnc铣削前板(2),其与压力机menbranowo-真空(2.1)连接,从那里到达一组单元头, cnc钻孔,铣削和最终处理(6),然后在ajnik u00f3w运输(a1)处的第一个顺序到达成品仓库(10)。第二个字符串给料机运输(b1)是formaryzerko-czopiarki(3),与线路连接到op u3.12aszczawiania面板和面板(3.1)。出口线通向op u0142aszczawiania面板和面板(3.1),第二个字符串给料器(b1)在三个方向上传输分支。第一个分支(b1.1)是到obr u00f3bczym的连接线,用于格式化记录和切割槽“ v ”(7),并且与位置 u015bcisk u00f3w连接在一起以粘合在一起,并用于wykroj u00f3w p u0142ycin(7.1),导致成品仓库(10)。成品仓库(10)也与第二个分支(b1.2)的op u0142aszczawiania面板和面板(3.1)分支线不在操作中。 b1.3)通过支线(b1)进行的第二次运输将其与基站(1)连接起来。第三串馈线运输机(c1)将基站(1)与一条成型线和oklejania窄平面(4)连接起来。第三串馈线运输机(c1)的出口线路应分配在第一条(c1.1)通向一组单元头,进行cnc钻孔,铣削和加工,最后一条(6),第二条(c1.2)连接至福莫瓦尼亚和奥克雷亚尼亚窄面(4)的仓库,成品(10)。第四串进料器运输装置(d1)将基站(1)与strugark stronstronn u0105(5)连接在一起,并与一条管线协同操作,以连接狭窄的元件(5.1)。出口到op u0142aszczowiania狭窄元件(5.1)的出口管线第四串进料器运输(d1)沿三个方向分布。位于第一方向(d1).1)上的分配器是成品仓库(10),位于第二方向(d1.2)上的分配器到达边缘梁线并格式化切割槽“ v” (8),从那里到 u015bcisk u00f3w粘合在一起,并为wykroj u00f3w边缘梁(8.1)粘合,然后进一步到达成品仓库(10)。位于第三方向(d1.3)的点胶机是nak u0142adarki法兰到窄的法兰边缘(8.2),从那里进入铣削对象(8.3)。对于frezark u0105 obwiedniow u0105(8.3),位于第三方向(d1.3)的任何一个都有两个臂,第一个臂(d.1.3.1)借助它们与边缘梁对齐并形成切割槽 “ v ”(8),位于第三方向(d1.3)的第二臂(d.1.3.2)进料器是成品(10)的仓库。rozkrawarka薄膜(9)连接到第一podajnikiem( e1)线至op u0142aszczawiania面板和面板(3.1),以及podajnikiem第二(e2)线,用于模制和oklejania窄平面(4)。 rozkrawarka胶片(9)连接到第三个podajnikiem线(e3),连接到opz狭窄元素(5.1)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号