首页> 外国专利> METHOD FOR ANALYZING OPERATION STATE OF SUBSTATION BY COMBINING WHOLE GRID MODEL WITH LOCAL GRID MODEL

METHOD FOR ANALYZING OPERATION STATE OF SUBSTATION BY COMBINING WHOLE GRID MODEL WITH LOCAL GRID MODEL

机译:全网格模型与局部网格模型相结合的变电站运行状态分析方法

摘要

The disclosure relates to the crossing field between a power transmission of an ultra-high-voltage and a power system simulation, specifically a method for analyzing an operation state of a substation by combining a whole grid model with a local grid model is provided according to the disclosure. The method includes following steps: performing a load flow calculation for the provincial grid to which a ultra-high-voltage line belongs, wherein initial data of the load flow calculation employs a grid model with E format for national power grid dispatching control center; making an equivalent transform for the model, forming an island independently from the provincial grid to which a ultra-high- voltage line belongs, and making a load flow calculation for the island to acquire data of node voltages and line transmission power.
机译:本发明涉及超高压输电与电力系统仿真之间的交叉领域,具体而言,提供了一种通过将整个电网模型与局部电网模型相结合来分析变电站运行状态的方法。披露。该方法包括以下步骤:对超高压线路所属的省级电网进行潮流计算,其中潮流计算的初始数据采用国家电网调度控制中心E格式的网格模型。对模型进行等效变换,独立于超高压线路所属的省级电网形成孤岛,并对孤岛进行潮流计算,以获取节点电压和线路传输功率的数据。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号