首页> 外国专利> METHOD OF GRADUALLY DISMANTLING OVER-PASS BRIDGE AND DEVICE TO PREVENT OVERTURN OF AXIALLY-MOVABLE BRIDGE DISMANTLING MEMBER USED FOR METHOD

METHOD OF GRADUALLY DISMANTLING OVER-PASS BRIDGE AND DEVICE TO PREVENT OVERTURN OF AXIALLY-MOVABLE BRIDGE DISMANTLING MEMBER USED FOR METHOD

机译:跨接桥的逐步拆除方法及防止该方法使用的轴向移动桥式拆除构件翻转的装置

摘要

The present invention relates to a method of dismantling an over-pass bridge. The main purpose of the present invention is to facilitate a movement of a bridge dismantling member of the over-pass bridge installed in an upper side of a railroad line or a river wherein a girder and an upper plate are joined to a place where the bridge dismantling member is to be ground. To achieve this, the method of gradually dismantling the over-pass bridge comprises: a first step of punching holes for towing to facilitate a penetration of a wire rope; a second step of cutting the upper plate of the bridge in a longitudinal direction with a diamond wire saw; a third step of towing the bridge dismantling member wherein the girder is joined with the cut upper plate with heavy equipment; a grinding preparation step of transferring the bridge dismantling member to a space where the bridge dismantling member is to be ground; and a grinding step of grinding the bridge dismantling member prepared in the grinding preparation step with a breaker or a crusher. The grinding preparation step includes a bridge dismantling member transferring step transferring the bridge dismantling member in a transverse direction to avoid the railroad line or the river on a lower side of the bridge by loading the bridge dismantling member on an overturn preventing device. Accordingly, in accordance with the present invention, an effect of easily transferring the bridge dismantling member joined with the girder and the upper plate of the over-pass bridge installed over the railroad line or the river to the place where the bridge dismantling member is to be ground is obtained. In addition, an effect of easily dismantling the bridge even in case of operation of the railways on a lower side of the bridge is obtained.;COPYRIGHT KIPO 2017
机译:本发明涉及一种拆卸天桥的方法。本发明的主要目的是促进安装在铁路或河流的上侧的立交桥的桥梁拆卸构件的运动,其中,大梁和上板连接到桥梁的地方。拆解员要接地。为此,逐渐拆除天桥的方法包括:第一步,在牵引孔上打孔以促进钢丝绳的穿入;第二步,用金刚石线锯沿纵向切割桥的上板。拖曳桥梁拆卸构件的第三步,其中,将大梁用重型设备与切下的上板连接;研磨准备步骤,将所述桥拆卸构件转移到将要研磨所述桥拆卸构件的空间中;研磨工序是用破碎机或破碎机将在研磨准备工序中准备的桥拆卸部件进行研磨的工序。磨削准备步骤包括桥拆卸部件传送步骤,该步骤是通过将桥拆卸部件装载在防倾覆装置上来在横向方向上移动桥拆卸部件以避开铁路线或桥的下侧的河流。因此,根据本发明,具有将与安装在铁路线或河流上的立交桥的梁和桥的上板结合的桥拆卸构件容易地转移到桥拆卸构件所要到达的位置的效果。被磨碎。此外,即使在桥下侧的铁路运营的情况下,也能获得轻松拆除桥的效果。; COPYRIGHT KIPO 2017

著录项

  • 公开/公告号KR20160148198A

    专利类型

  • 公开/公告日2016-12-26

    原文格式PDF

  • 申请/专利权人 PARK JONG HEOK;SUNG JAE DUK;

    申请/专利号KR20150084871

  • 发明设计人 PARK JONG HEOKKR;SUNG JAE DUKKR;

    申请日2015-06-16

  • 分类号E01D24/00;

  • 国家 KR

  • 入库时间 2022-08-21 13:28:43

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号