首页>
外国专利>
PILE-GIRDER INTEGRAL CONNECTION STRUCTURE, CONNECTION METHOD, ASSEMBLY TYPE PRECAST PIER USING SAME, AND CONSTRUCTION METHOD THEREOF
PILE-GIRDER INTEGRAL CONNECTION STRUCTURE, CONNECTION METHOD, ASSEMBLY TYPE PRECAST PIER USING SAME, AND CONSTRUCTION METHOD THEREOF
展开▼
机译:桩-梁整体连接结构,连接方法,使用相同的组装式预制桩及其施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a pile-girder integral connection structure, a connection method, an assembly type precast pier using the same, and to a construction method thereof. A pile connection member and a girder connection member are closely and mechanically fixated at the upper end of a pile prepared with a steel pipe or concrete. A precast girder is put up on top of the girder connection member, and concrete is poured to a girder connection part between the precast girders to reclaim the pile connection member. Thus, the pile, girder connection member, and precast girder are simultaneously integrated, and the precast girders are made continuous to enable construction of girders between long axis. As a result, the pile-girder integral connection structure maximizes the spacing between the lower piles, and thus increases safety and cost-efficiency when quickly constructed and constructed.;COPYRIGHT KIPO 2017
展开▼