首页>
外国专利>
PILE CONSTRUCTION METHOD TO REINFORCE FRICTION PILE IN ACCORDANCE WITH CHANGES IN STRATA
PILE CONSTRUCTION METHOD TO REINFORCE FRICTION PILE IN ACCORDANCE WITH CHANGES IN STRATA
展开▼
机译:随地层变化而加固摩擦桩的桩施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a pile construction method to reinforce a friction pile in accordance with changes in a strata, comprising: (a) a step of measuring a position on which a pile will be constructed by a design; (b) a step of excavating the position measured by step (a); and (c) a step of inserting a friction pile and a non-friction pile to correspond to a section requiring a friction pile and another section requiring a non-friction pile in accordance with changes in the strata of the excavated ground and a structural calculation. The present invention is able to reflect changes in strata of the ground on which a pile will be constructed, and assemble a pile with a high friction factor and a pile with a low friction factor to fit a section with an increased friction force and another section without an increase in friction force; thereby efficiently constructing the piles. That is, piles are able to be constructed to fit a structural calculation and the strata of the ground, and the ground is able to economically be more reinforced.;COPYRIGHT KIPO 2017
展开▼