首页>
外国专利>
concrete ballast turnout construction method
concrete ballast turnout construction method
展开▼
机译:混凝土道ast道岔施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a concrete ballast turnout construction method, which comprises: a first step of dismantling a wooden pillow and a rail coupling port of a sleeper turnout which is conventionally installed from a rail; a second step of chipping a concrete floor in a position in which the wooden pillow is dismantled, and temporarily assembling a vibration proof coupling port in the rail; a third step of depositing and curing filling concrete in the position in which the wooden pillow is dismantled so as to form a predetermined space unit in a lower portion of the vibration proof coupling port; and a fourth step of injecting and hardening a filling material in the space unit.
展开▼