首页>
外国专利>
EXCAVATION HEAD FOR PILE HOLE AND EXCAVATION METHOD FOR PILE HOLE
EXCAVATION HEAD FOR PILE HOLE AND EXCAVATION METHOD FOR PILE HOLE
展开▼
机译:桩孔开挖头及桩孔开挖方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
Even when a foreign object such as gravel appears, it is not caught in the excavation head and does not interrupt the excavation work. The digging hole drilling head 30 is constructed by attaching excavating arms 15 and 15 to the horizontal shafts 12 and 12 of the head main body 1 so as to freely swing. The fixed excavating blades 10 and 10 of the length H 1 are fixed to the lower face 6a of the head main body 1 with the interval W 1 therebetween. The female excavating blades 24 and 24 of length H 2 are fixed to the lower end 15a of the excavating arm 15 with a gap W 2 therebetween. To the pre-ground investigation, if not to a foreign substance such as a pebble of a maximum particle diameter (D 0) is present, "length (H 1) and the distance (W 1) D 0 of the fixed drilling edge 11", "Rock Excavation And the length (H 2 ) and the interval (W 2 ) D 0 of the blade 24 are satisfied. The distance L 1 in the horizontal direction between the tip 25 of the female excavating blade 24 and the tip 11 of the fixed excavating blade 10 is larger than the distance D 0 between the tip 25 of the female excavating blade 24 And the distance h 1 in the vertical direction of the distal end 11 of the fixed excavating blade 10 D 0 .
展开▼
机译:即使出现砾石之类的异物,也不会卡在挖掘头中,也不会打扰挖掘工作。挖掘孔钻头30是通过将挖掘臂15和15安装到钻头主体1的水平轴12和12上而自由摆动而构成的。长度H 1 Sub>的固定挖掘刀片10和10以其间的间隔W 1 Sub>固定在头部主体1的下表面6a上。长度为H 2 Sub>的阴型挖掘刀片24和24固定在挖掘臂15的下端15a,其间具有间隙W 2 Sub>。对于地面前调查,如果不存在异物,例如最大粒径(D 0) Sub>的鹅卵石,则“长度(H 1) Sub>固定钻沿11的距离(W 1)> Sub> D 0 Sub>”,“岩石开挖和长度(H 2 Sub>)以及满足刀片24的间隔(W 2 Sub>)> D 0 Sub>,在刀片24的尖端25之间的水平方向上的距离L 1 Sub>。凹型挖掘刀片24与固定挖掘刀片10的尖端11大于凹型挖掘刀片24的尖端25与距离h 1 in Sub之间的距离D 0 Sub> >固定挖掘刃10的前端11的垂直方向> D 0 Sub>。
展开▼