首页> 外国专利> SIDEWALK FOR A BRIDGE USING HANGER AND CONSTRUCTION METHOD THEREOF FOOTBRIDGE FOR LANDSCAPE USING HANGER AND CONSTRUCTION METHOD THEREOF

SIDEWALK FOR A BRIDGE USING HANGER AND CONSTRUCTION METHOD THEREOF FOOTBRIDGE FOR LANDSCAPE USING HANGER AND CONSTRUCTION METHOD THEREOF

机译:悬臂式桥架及其构造方法悬臂式桥架景观及其构造方法

摘要

The present invention provides a walkway for a bridge and a method of constructing the bridge so that only the vehicle runs on the upper part of the bridge and only the pedestrian and the bicycle can pass on the lower part of the bridge, and a bridge for pedestrians and bicycles located at the lower part of the bridge The pedestrian's passage and bicycle operation with a drainage section to prevent accidents caused by icicles generated in the upper part of the bridge after snow or rain in winter are provided It is an object of the present invention to provide a possible sidewalk for a bridge and a construction method thereof, and to provide a landscape bridge for a landscape and a construction method thereof. In order to achieve the above object, a sidewalk for a bridge capable of traveling a pedestrian and a bicycle according to the present invention is a sidewalk for a bridge connected to a side surface of a girder provided at a lower portion of a slab constituting a bridge, A plurality of square-zinc angle tubes fixed to the upper plate of the bracket at a predetermined interval in a vertical direction and fixed to the upper plate of the bracket at a predetermined distance from the outer end of the bracket in a direction perpendicular to the vertical wall of the vertical wall; A pedestrian guardrail provided on a side portion of the parapet-bearing square steel pipe in which the bracket is not positioned, and a pedestrian guardrail provided on the upper portion of the plurality of square- A deck plate disposed in the same direction as the square-zinc angle tube; , One top and the bottom ash that are installed by greater plate and the vertical direction is coupled to the upper surface of the girder by the upper fixing piece, one side of the lower end is characterized in that it comprises a hanger coupled to the bracket by the lower batten.
机译:本发明提供了一种用于桥梁的人行道和一种构造该桥梁的方法,以使得仅车辆在该桥梁的上部行驶,并且仅行人和自行车可以在该桥梁的下部通过。位于桥下部的行人和自行车为了防止冬季下雨或下雨后桥上部产生的冰柱造成事故,提供了行人通过和具有排水部分的自行车操作,这是本发明的目的。本发明提供一种可能的桥梁人行道及其施工方法,并提供一种用于景观的景观桥及其施工方法。为了实现上述目的,根据本发明的能够使行人和自行车行进的桥梁的人行道是连接到设置在构成混凝土板的下部的梁的侧表面上的桥梁的人行道。桥,在垂直方向上以预定间隔固定在支架的上板上,并在垂直方向上与支架的外端以预定距离固定在支架的上板上的多个方锌角管。至垂直壁的垂直壁;在没有设置托架的带护墙的方钢管的侧面部分上设置有行人护栏,在多个正方形的上部上设置有行人护栏。 -锌角管;上,下灰由大板安装,垂直方向通过上固定件连接到大梁的上表面,下端的一侧的特征在于,它包括与支架相连的吊架由下板条。

著录项

  • 公开/公告号KR101727124B1

    专利类型

  • 公开/公告日2017-04-14

    原文格式PDF

  • 申请/专利权人 휴먼이엔씨주식회사;

    申请/专利号KR20140146166

  • 发明设计人 김동수;

    申请日2014-10-27

  • 分类号E01D19/16;E01C1;E01D19/08;E01D19/10;E01D21;

  • 国家 KR

  • 入库时间 2022-08-21 13:25:42

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号