首页>
外国专利>
3 3-Layered cutoff wall structure with pile of wall steel pipe and variabld linking body and construction method of cutoff wall using the same
3 3-Layered cutoff wall structure with pile of wall steel pipe and variabld linking body and construction method of cutoff wall using the same
展开▼
机译:3带有壁钢管和可变连接体的三层防渗墙结构及其使用的防渗墙的施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a triple water shielding wall structure including a wall steel pipe pile and a variable connector, and to a method for shielding water by using the same. The triple water shielding wall structure comprises: a plurality of main steel pipes for constituting the body of a wall steel pipe pile; and a connector combined with the main steel pipes, and continuously connecting the main steel pipes therebetween to form a wall. A water shielding function with respect to a displacement in accordance with a moment affecting from various directions can be ensured, and support power can be ensured even when a heavy object such as an artificial island or a landfill to which a great load is applied is disposed in the wall steel pipe pile.
展开▼