首页>
外国专利>
MEASUREMENT MANAGEMENT SYSTEM, CONSTRUCTION SUPPORT SYSTEM, MEASUREMENT MANAGEMENT METHOD, AND CONSTRUCTION SUPPORT METHOD
MEASUREMENT MANAGEMENT SYSTEM, CONSTRUCTION SUPPORT SYSTEM, MEASUREMENT MANAGEMENT METHOD, AND CONSTRUCTION SUPPORT METHOD
展开▼
机译:测量管理系统,施工支持系统,测量管理方法和施工支持方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a measurement management system, a construction support system, a measurement management method, and a construction support method capable of detecting failures caused by the transmitting and receiving of measurement results for construction while checking measurement results.;SOLUTION: Time information regarding measurement time is included in measurement results information regarding measurement results obtained by a measurement device 100 for measuring displacement of a track 120a. A communication abnormality is determined when a first time comparison result from the comparison of time information regarding actual measurement result information stored in a storage part 22 and time information regarding received measurement result information received by a transmitting-receiving part 34 is greater than a first prescribed time. A communication abnormality is determined when a second time comparison result from the comparison of time information for stored measurement result information and measurement time is greater than a second prescribed time.;SELECTED DRAWING: Figure 2;COPYRIGHT: (C)2018,JPO&INPIT
展开▼