首页> 外国专利> Method of treating pile head of cutting material and on-site construction pile

Method of treating pile head of cutting material and on-site construction pile

机译:切削材料桩头的处理方法及现场施工桩

摘要

PROBLEM TO BE SOLVED: To provide a parting member and a pile head treatment method for an on-site constructed pile that facilitate demolition of excess concrete.SOLUTION: A parting member 1 has a plurality of slits at a prescribed interval on a surface 3 of a mat-like body 2 formed of a stretchable material. A cage 35 made of reinforcing bars and having the parting member 1 fitted in a circumferential direction is inserted into a hole 39 excavated into a ground while holding an upper part of a main reinforcement 37 in a slit, and concrete is cast for constructing an on-site constructed pile 29. Then, concrete at an outside part 41 of the parting member 1 is removed, the concrete being a part of excess concrete 33 at a pile head of the on-site constructed pile 29, and the parting member 1 is removed from the cage 35. Furthermore, concrete at an inner part 43 of the parting member 1 is removed, the concrete being a part of the excess concrete 33.
机译:解决的问题:提供一种用于现场施工的桩的分型构件和桩头处理方法,以促进过量混凝土的拆除。解决方案:分型构件1在其表面3上以预定间隔具有多个狭缝。由可拉伸材料形成的垫状体2。在将主加强件37的上部保持在狭缝中的同时,将由钢筋制成并且具有沿圆周方向装配的分型构件1的保持架35插入挖掘到地面的孔39中,并且浇铸混凝土以用于构造混凝土。现场施工桩29。然后,去除分离构件1的外部41处的混凝土,该混凝土是现场施工桩29的桩头处的过量混凝土33的一部分,并且分离构件1从保持架35中除去混凝土。此外,分离构件1的内部43处的混凝土被除去,该混凝土是过量混凝土33的一部分。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号