首页> 外国专利> Train diagram recovery system and train operation management method

Train diagram recovery system and train operation management method

机译:列车运行图恢复系统及列车运行管理方法

摘要

Upon the input, to an input unit, of operation coordination information calling for a first operation coordination for a train, a train schedule modification finalization unit modifies a train schedule on the basis of the operation coordination information, and an inconsistency detection determination unit determines whether there is inconsistency between the modified train schedule and a utilization coordination plan. If there is inconsistency, a utilization coordination finalization unit drafts, on the basis of the modified train schedule, a first utilization coordination for coordinating the utilization of a resource, and a train schedule influence determination unit determines whether the first utilization coordination will influence the train schedule. If the first operation coordination will influence the train schedule, a train schedule reflection unit reflects the influence in the train schedule or issues a warning.
机译:在将要求火车的第一操作协调的操作协调信息输入到输入单元时,列车时刻表修改确定单元基于该操作协调信息来修改列车时刻表,并且不一致检测确定单元确定是否修改后的火车时刻表与使用协调计划之间不一致。如果存在不一致,则利用协调确定单元根据修改后的火车时刻表起草用于协调资源利用的第一利用协调,并且火车时刻表影响确定单元确定第一利用协调是否会影响火车。时间表。如果第一操作协调将影响火车时刻表,则火车时刻表反映单元将影响反映在火车时刻表中或发出警告。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号