首页> 外国专利> SYSTEM AND METHOD FOR INSTALLING CASING IN A BLIND HORIZONTAL WELL

SYSTEM AND METHOD FOR INSTALLING CASING IN A BLIND HORIZONTAL WELL

机译:在水平井中安装套管的系统和方法

摘要

A system and method for installing casing in a blind horizontal well for blind horizontal directional borings. The system and method may include an example of an offset transmitter sonde assembly that contains an open central passage through which well casing can be inserted, and an example of a drill bit assembly that may be remotely uncoupled from a drill string, leaving the bit in the bore created. Remote uncoupling of the drill bit assembly tends to allow a casing to be installed in the bore while the drill string and bit remain in the bore for support during casing installation. After installation of the casing the drill bit assembly may be uncoupled from the drill string, allowing the drill string to be withdrawn from the bore, with the drill bit assembly remaining in the bore.
机译:一种用于将套管安装在水平盲井中的套管的系统和方法。该系统和方法可以包括:偏置变送器探空仪组件的示例,其包括可插入井套管的敞开的中央通道;以及钻头组件的示例,其可与钻柱远程脱开,从而将钻头留在产生的孔。钻头组件的远程解耦倾向于允许将套管安装在孔中,而钻柱和钻头保留在孔中以在套管安装期间进行支撑。在安装套管之后,可以将钻头组件与钻柱解耦,从而允许将钻柱从孔中抽出,而将钻头组件保留在孔中。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号