首页> 外国专利> Optimized asset maintenance and replacement schedule

Optimized asset maintenance and replacement schedule

机译:优化资产维护和更换时间表

摘要

There are provided a system, a method and a computer program product for generating an optimal preventive maintenance/replacement schedule for a set of assets. The method includes receiving data regarding an asset, said data including a failure rate function of said asset, a cost of preventative maintenance (PM) of said asset, a cost of an asset failure, and a cost of replacing an asset. An optimal number K of preventative maintenance time intervals tk and an indication of a possible replacement is computed and stored for each asset by minimizing a mean cost-rate value function with respect to an electrical age of the asset. A first PM schedule is formed without consideration of labor and budget resource constraints. The method further generates a second maintenance schedule for a system of assets by minimizing a deviation from the optimal PM time intervals subject to the labor and budget resource constraints.
机译:提供了一种用于为一组资产生成最佳的预防性维护/更换时间表的系统,方法和计算机程序产品。该方法包括接收关于资产的数据,所述数据包括所述资产的故障率函数,所述资产的预防性维护成本(PM),资产故障的成本以及更换资产的成本。通过最小化资产的平均电价率函数来计算和存储每种资产的最佳预防性维护时间间隔t k 以及可能替换的指示。在不考虑人工和预算资源约束的情况下,形成了第一项PM计划。该方法还通过使与最佳PM时间间隔的偏差最小化而对资产系统产生第二维护时间表,该最佳维护时间间隔受到人工和预算资源的约束。

著录项

  • 公开/公告号US9959515B2

    专利类型

  • 公开/公告日2018-05-01

    原文格式PDF

  • 申请/专利权人 INTERNATIONAL BUSINESS MACHINES CORPORATION;

    申请/专利号US201514796704

  • 发明设计人 DUNG PHAN;JINJUN XIONG;

    申请日2015-07-10

  • 分类号G06F11/30;G21C17;G06Q10/06;G01M99;G06Q10;

  • 国家 US

  • 入库时间 2022-08-21 12:56:22

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号