首页> 外国专利> Method for unloading bales from a round baler on a field

Method for unloading bales from a round baler on a field

机译:从现场的圆形打捆机上卸下捆包的方法

摘要

Method for unloading a first and a second bale from a round baler on a field, the round baler comprising a bale chamber and a bale holder, and the method comprising the following steps: - producing the second bale in the bale chamber, while the first bale is carried by the bale holder; - releasing the first bale from the bale holder onto the field for a period of time before stopping the production of the second bale, the first bale defining a first position on the field; - stopping the production of the second bale, transporting the second bale from the bale chamber to the bale holder, and releasing the second bale from the bale holder to the field, the second bale defining a second position on the field; and wherein the time frame is determined such that a distance between the first position and the second position is less than a sum of the diameters of the first bale and the second bale.
机译:从现场的圆形打包机上卸下第一和第二打包机的方法,该圆形打包机包括打包机室和打包机支架,该方法包括以下步骤:-在打包机室中生产第二打包机,而第一捆由捆包持有人携带; -在停止生产第二捆之前,先将第一捆从捆保持器释放到田间,第一捆确定了田中的第一位置; -停止第二包的生产,将第二包从包室运送到包保持器,并将第二包从包保持器释放到田间,第二包在田间限定第二位置;其中确定时间范围,使得第一位置和第二位置之间的距离小于第一捆和第二捆的直径之和。

著录项

  • 公开/公告号BE1024274B1

    专利类型

  • 公开/公告日2018-01-11

    原文格式PDF

  • 申请/专利权人 CNH INDUSTRIAL BELGIUM NV;

    申请/专利号BE20160005709

  • 发明设计人 MONTEYNE NIKLAAS;LAMMERANT EDDY ROLAND;

    申请日2016-09-21

  • 分类号A01F15/08;A01D85;A01F15/07;

  • 国家 BE

  • 入库时间 2022-08-21 12:54:13

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号