首页> 外国专利> Method for connecting first and second sections together an assembly of suspension crane.Method of moving a connector and combination of group of suspension for a crane and winch mounted on the structure together

Method for connecting first and second sections together an assembly of suspension crane.Method of moving a connector and combination of group of suspension for a crane and winch mounted on the structure together

机译:将悬吊起重机的第一部分和第二部分连接在一起的方法。移动连接器的方法以及起重机的悬架组和绞盘上安装的绞车的组合在一起的方法

摘要

Method for connecting first and second sections together an assembly of suspension crane.Method of moving a connector and combination of group of suspension for a crane and winch mounted together in the structure.The present invention relates to a method of connecting sections together a set of suspension of the crane (10) includes attaching a structure (53, 103, 123143) a member of a first section; connecting a tension member (32, 106) between the ES trutura (53, 103, 123, 143), and a connector (74, 94) used in the mount gem; moving the state of tension (32,106) so that the connectors (74,94) integrated on a pin (89) to a position where a hole is in the secondary connector is in alignment with a hole in one is secondary state of the section; placing a second pin (89) through the hole in the COnector (74, 94) and the hole through the second member of the if - tion; and disconnecting the state of tension (32, 106) of a connector (74, 94).The method may also include attaching a structure (53, 103, 123, 143) with a winch (54) to a section of the set of suspen - are of the crane (10); connecting a cable winch (56) to the connector (74,94); activating the winch (54) to move the connector (74, 94) so that they rotate about an axis of articulation; and securing the connector (74, 94) in its second position.
机译:将悬吊起重机的组件的第一部分和第二部分连接在一起的方法。将起重机的悬吊器组和绞车的悬挂器组和绞盘的组合移动到结构中的方法。起重机(10)的悬架包括将结构(53、103、123143)附接至第一部分的构件;将抗拉构件(32、106)连接在ES trutura(53、103、123、143)和镶嵌宝石中使用的连接器(74、94)之间;该部分的第二状态是使张紧状态(32,106)移动,使集成在销(89)上的连接器(74,94)移动到第二连接器中的孔与孔对准的位置。将第二个销钉(89)穿过连接器(74、94)上的孔,并将孔穿过第二个部件。所述方法还可以包括将具有绞盘(54)的结构(53、103、123、143)附接到该组的一部分上,并断开连接器(74、94)的张紧状态(32、106)。悬架-起重机(10)的悬架;将绞盘(56)连接到连接器(74,94);激活绞盘(54)以移动连接器(74、94),使其绕着铰接轴线旋转;将连接器(74、94)固定在第二位置。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号