首页> 外国专利> METHOD FOR SIMULTANEOUS REPLACEMENT OF WELLHEAD MASTER VALVES UNDER PRESSURE (EMBODIMENTS) AND DEVICE FOR IMPLEMENTATION THEREOF (EMBODIMENTS)

METHOD FOR SIMULTANEOUS REPLACEMENT OF WELLHEAD MASTER VALVES UNDER PRESSURE (EMBODIMENTS) AND DEVICE FOR IMPLEMENTATION THEREOF (EMBODIMENTS)

机译:在压力下同时更换井口主阀的方法(实施例)及其实施装置(实施例)

摘要

The invention is related to oil-and-gas producing industry. The essence of the vertical valve replacement method: on the upper flange of the swab valve, a hydraulic unit body with an inserted packoff assembly is mounted through an adapter, the packoff assembly including a packer with a sealing collar, a threaded sleeve and a clutch, a hollow mounting rod having a two-step outer surface, and a packing rod. Two posts of composite drive screws are connected on two diametrically opposite sides of the cross member in parallel with the axis of the valve and of the hydraulic unit body. The foundation plate is mounted on the posts providing alignment of the plate central bore with the axis of the hydraulic unit body and the valves by screwing a sliding stop nut on the hydraulic unit body until seating in the central bore of the foundation plate, and the posts are fixed on the plate. A hollow packer drive screw is screwed into the hydraulic unit body until it touches a step of the hollow mounting rod, composite drive screws are installed and fixed on the foundation plate, after which an additional plate is mounted on the composite drive screws until touching the end of the mounting rod. Screw couplings are fixed on the additional plate. After that, the failed central valve and the swab valve are opened in turn, and the presence of pressure in the inside cavity of the hydraulic unit body is checked. By rotating the packer drive screw, the hollow rod with the packing rod is entered in the bores of the valves to the depth of the packer seating. The sealing collar is mounted by means of the packing rod. After blocking of the wellhead valve line bores, excess pressure in the inside cavity of the hydraulic unit body is reduced. If there is no fluid leaks from the well through the packer, the mounting rod is fixed, and the plate is pressed by tightening the nuts, after which the hydraulic unit body with the valves joined to it is lifted above the wellhead equipment to mount a guard flange for maintaining the sealing state of the packer in the wellhead borehole. The hollow rod and the packing rod are disconnected and withdrawn from the failed valve borehole, after which the failed valve is replaced by a new one. Then a reverse process is performed ended by the packer withdrawal from the wellhead borehole, closure of the central valve and dismantling of the valve replacement device. The method of wing valve replacement differs from the first version by using trolleys running along a cargo monorail constituting a part of the composite drive screw for replacement of the upper master valve and the central valve to be replaced. The technical result consists in provision of a high-technology method for simultaneous replacement of failed vertical and wing borehole valves of the wellhead equipment.
机译:本发明涉及油气生产工业。垂直阀更换方法的实质:在棉签阀的上法兰上,通过适配器安装了带有插入式封隔器组件的液压单元本体,该封隔器组件包括带有密封环,螺纹套筒和离合器的封隔器,具有两步外表面的中空安装杆和填料杆。复合驱动螺钉的两个支柱平行于阀和液压单元本体的轴线连接在横梁的两个直径相对的侧面上。将基础板安装在支柱上,通过将滑动止动螺母拧到液压单元主体上,直到其固定在基础板的中心孔中,从而将板的中心孔与液压单元主体和阀的轴线对齐。柱子固定在板上。将空心的封隔器驱动螺钉拧入液压单元主体中,直到它接触空心安装杆的台阶为止。将复合驱动器螺钉安装并固定在基础板上,然后将另一块板安装在复合驱动器螺钉上,直到接触到安装杆的一端。螺旋联轴器固定在附加板上。之后,将失效的中央阀和拭子阀依次打开,并检查液压单元体内部腔中压力的存在。通过旋转封隔器驱动螺钉,带有封隔器杆的空心杆进入阀门的孔中,到达封隔器阀座的深度。密封环通过密封杆安装。在堵塞井口阀管路孔之后,液压单元主体内部腔体中的过剩压力会减少。如果没有流体通过封隔器从井中泄漏,则固定安装杆,并通过拧紧螺母来压紧板,然后将连接有阀的液压单元本体提升到井口设备上方,以安装一个保护法兰,用于保持封隔器在井口井眼中的密封状态。将空心杆和填料杆从故障阀孔中断开并拔出,然后用新的故障阀更换。然后,通过封隔器从井口钻孔中抽出,关闭中心阀并拆卸阀更换装置来结束反向过程。机翼阀的更换方法与第一种方法不同,它使用沿着构成复合驱动螺杆一部分的货物单轨运行的手推车来更换上部主阀和要更换的中央阀。技术成果在于提供了一种高科技方法,用于同时更换井口设备的故障垂直和翼形钻孔阀。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号