首页> 外国专利> A METHOD OF WELD SEQUENCING TO CONTROL DISTORTION IN WELDING OF BURNER PANELS OF HIGH PRESSURE, HIGH TEMPERATURE STEAM GENERATOR OF POWER PLANT

A METHOD OF WELD SEQUENCING TO CONTROL DISTORTION IN WELDING OF BURNER PANELS OF HIGH PRESSURE, HIGH TEMPERATURE STEAM GENERATOR OF POWER PLANT

机译:电厂高温高压蒸汽发生器燃烧盘焊接中的焊接排序控制方法

摘要

According to the invention, a method of weld sequencing for welding the burner panel (P) used in high pressure, high temperature steam generator, is disclosed. The welds available in in the panel are classified as vertical welds (7), horizontal welds (5) and inclined welds (6) depending on their configuration. The vertical welds (7) available in the top side of the burner panel (P) are completed first using eight welders (four welders on side A and four welders on side B) with each of the welder welding 1/4th the length of the burner panel (P) at identified locations proceeding from the center (C) towards both the right (R2) and left (L2) extremities of the panel simultaneously. Then panel (P) is then turned upside down and all the welds namely vertical (7), horizontal (5) and inclined (6) welds are completed in this position in the said order. Then the panel is again turned and the remaining welds namely horizontal and inclined welds are completed.
机译:根据本发明,公开了一种用于焊接在高温高压蒸汽发生器中使用的燃烧器面板(P)的焊接顺序的方法。面板中可用的焊缝根据其配置分为垂直焊缝(7),水平焊缝(5)和倾斜焊缝(6)。燃烧器面板(P)顶部可用的垂直焊缝(7)首先使用八名焊工(A侧的四名焊工,B侧的四名焊工)完成,每个焊工的焊接长度为焊条长度的1/4。燃烧器面板(P)从中心(C)朝面板的右(R2)和左(L2)末端同时行进。然后将面板(P)倒置,所有焊接,即垂直(7),水平(5)和倾斜(6)焊缝均按所述顺序在该位置完成。然后再次旋转面板,完成剩余的焊缝,即水平焊缝和倾斜焊缝。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号