首页> 外国专利> METHOD OF CONSTRUCTING BASE OF BRIDGE PIER IN WATER AND STRUCTURE THEREOF

METHOD OF CONSTRUCTING BASE OF BRIDGE PIER IN WATER AND STRUCTURE THEREOF

机译:水中桥墩基础施工方法及其结构

摘要

The present invention relates to a method to construct a pier in water and a construction method thereof. According to the present invention, the construction structure comprises: two or more piles driven and installed into the ground under the water; a casing disposed to support the piles and having a protrusion part outwardly protruding from a position separated from the top of the pile; a precast block having a through-hole for receiving the casing to be supported and held to the protrusion part in a shape of allowing the through-hole to surround the casing; and pier parts installed on the upper side of the precast block. Accordingly, without a cofferdam requiring high costs and a long construction period, a pier is able to be constructed with a precast block, installed and supported to the top of the pile, at low costs in a short period regardless of a height variance in a bedrock topology.
机译:本发明涉及一种在水中建造码头的方法及其施工方法。根据本发明,该建筑结构包括:两根或更多根桩,被打入水下并安装到地下;壳体,用于支撑所述桩,并具有从与所述桩的顶部分离的位置向外突出的突出部。预制块,该预制块具有通孔,该通孔用于以允许该通孔围绕该壳体的形状容纳要支撑并保持到突出部的壳体。桥墩零件安装在预制砌块的上侧。因此,无需围堰就需要高成本和长施工时间,就可以在短时间内以低成本建造带有预制块的墩,该预制块安装并支撑到桩的顶部,而无需考虑桩高的变化。基岩拓扑。

著录项

  • 公开/公告号KR20180065510A

    专利类型

  • 公开/公告日2018-06-18

    原文格式PDF

  • 申请/专利权人 OH SEOK HWAN;

    申请/专利号KR20160166479

  • 发明设计人 OH SEOK HWAN;

    申请日2016-12-08

  • 分类号E01D19/02;E02D27/42;E02D27/52;E01D101/28;

  • 国家 KR

  • 入库时间 2022-08-21 12:39:50

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号